Altor Solutions

 
 

OVERVIEW

Altor Solutions is expanding its operations with a new 120,000 SF manufacturing facility that will serve as a cornerstone of its production capacity and contribute to local economic growth. Developed by Agracel, who will own and lease the building to Altor, the facility is located on a sublot within a growing industrial park. Lehman Daman is working in partnership with Agracel to manage the construction of the facility, which will include both production and office components.

PROJECT HIGHLIGHTS

  • 120,000 SF manufacturing facility situated on an 16-acre site

    • Includes 114,800 SF dedicated to warehouse, curing rooms, boiler and pump rooms, and storage areas

    • 5,200 SF consists of office space

  • Constructed using a Pre-Engineered Metal Building (PEMB) system

  • Equipped with five (5) dock bays and one drive-in-door for efficient logistics

  • Features a 2,000-amp electrical service

Client
Altor Solutions

Location
Newcomerstown, OH

Size
120,000 SF

Partners

Engineer: Kleinfelder