A confidential client needed to move their fleet maintenance activities out of one of their vehicle processing facilities into a dedicated building for vehicle service and repairs. After a positive experience with Lehman Daman on two ground-up inspection centers, the client engaged Lehman Daman to build a fleet maintenance facility in Greenfield, IN.
Read MoreAfter the successful completion of the confidential client’s first ever ground-up inspection center, the client engaged Lehman Daman to build another vehicle inspection center in Trenton, OH to help service their growing customer base. The confidential client purchased this 117-acre site to construct their building along with 100 acres of paving to house their inventory of used vehicles.
Read MoreRudolph Foods needed more cold storage at their existing plant. Lehman Daman built a ground-up, cold-storage expansion while working around their operations.
Read MoreHocking County was out of space in their industrial park. Consequently, businesses looking to expand or locate there were forced to look elsewhere. Make Build Ship, LLC, a local development firm, in partnership with the Hocking County Community Improvement Corporation, planned to build a speculative building in the Logan-Hocking Commerce Park to address this issue.
Read MorePath Robotics, a manufacturing company, hired Lehman Daman to build out and renovate their newly leased, 186,000 SF manufacturing plant and office.
Read MoreA confidential client engaged Lehman Daman to build their first ever ground-up inspection center in Heath, Ohio. This client purchased this 120-acre site to construct their building along with over 80 acres of paving to house their inventory of used cars.
Read MoreLehman Daman enclosed and expanded the maintenance garage, shielding workers from the elements and adding 4 truck bays.
Read MoreFST hit a ceiling with a key customer. Their client wanted to expand the relationship, but FST was physically out of cold storage space to adequately serve them. To respond, FST needed to carve out about 30,000 SF cooler inside of an existing 300,000 SF warehouse they were already leasing in what they called their first ever “box-in-a-box” project. FST hired Lehman Daman as their design/build contractor to solve the problem.
Read MoreOTP began in 1963 as a small Columbus, Ohio-based industrial distributor of mechanical power transmission equipment and pumps with six associates and $600,000 in sales. Now, more than 50 years later, OTP has grown to more than 600 associates working in 23 locations throughout the Midwest, South and New England with nearly $300 million in revenue.
Read MoreIn 2015, Vectra’s growing business prompted their Columbus operations to move into a nearby consolidated space that would include over 100,000 square feet of showroom, offices, and production.
Read MoreAssociated Plastics, a custom plastics injection and molding company based in Ada, OH, engaged Lehman Daman to design and build a 47,500 SF pre-engineered metal building addition to their existing facility.
Read MoreWhen Honeywell chose to consolidate their Central Ohio distribution facilities, they chose Lehman Daman for the buildout. This expansion doubled their Groveport space to nearly 800,000 square feet of state-of-the-art industrial warehousing.