IGS Energy

Project Overview
With a hybrid work model in place since COVID-19, IGS Energy aimed to reenergize its office culture and encourage more in-person collaboration. As a result, IGS Energy engaged Lehman Daman fora renovation consisting of enhancements to the existing café / breakroom, an upgraded training room, and the addition of a new coffee bar.

General Contracting
delivery
Renovation
project type
6,368 SF
Square feet

Project Challenges
During the course of the project, material delays presented significant challenges to the established timeline. These delays caused disruptions in the overall scheduling and required quick, flexible responses. Lehman Daman worked closely with IGS Energy to navigate these obstacles, maintaining clear communication and providing regular updates.
Lehman Daman proactively presented alternative solutions for material selections. When IGS Energy ultimately decided to wait for their preferred materials, Lehman Daman adapted by temporarily stepping away from the job site for three weeks. This strategic decision not only helped maintain efficiency but also resulted in cost savings, ensuring that the project remained on track.
Project Highlights









Medium length section heading
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Suspendisse varius enim in eros elementum tristique.
days ahead of schedule
Lorem ipsum dolor sit amet, consectetur adipiscing elit.
under budget
Lorem ipsum dolor sit amet, consectetur adipiscing elit.