Altor Solutions

New ground-up construction of 120,000-square-foot manufacturing facility for Altor Solutions in Newcomerstown, Ohio.
Altor Solutions

Project Overview

Agracel partnered with Lehman Daman to design and construct a 120,000-square-foot manufacturing facility for Altor Solutions in Newcomerstown, Ohio. Located on a 20-acre site within a growing industrial park, the facility represents a major step in Altor’s expansion strategy, boosting production capacity and supporting regional economic development. As design-builder, Lehman Daman collaborated closely with Agracel and Altor to deliver a flexible, future-ready facility tailored to operational needs.

Partners
Client
Agracel
Location
Newcomerstown, Ohio

Design/Build

delivery

New Construction

project type

120,000

Square feet

Project Challenges

Altor’s approaching lease expiration at its existing facility set a firm deadline that guided the entire project schedule. To meet this timeline, construction continued through the winter months. Lehman Daman implemented various cold-weather strategies, including temporary heat to keep interior spaces workable, protective barriers to shield areas from wind and snow, and concrete blankets to ensure proper curing during cold-weather pours.

The project also required flexibility to accommodate changes in Altor’s processing equipment during design and construction. Lehman Daman collaborated closely with the owner to integrate these updates seamlessly, ensuring the facility met operational needs without impacting the schedule. Through careful planning and coordination, Lehman Daman not only overcame these challenges, but delivered the project three weeks ahead of schedule.

Project Highlights

  • 120,000 SF manufacturing facility situated on a 20-acre site
    • Includes 114,800 SF dedicated to warehouse, curing rooms, boiler and pump rooms, and storage areas
    • 5,200 SF consists of office space
  • Constructed using a Pre-Engineered Metal Building (PEMB) system
  • Equipped with five (5) dock bays and one (1) drive-in-door for efficient logistics
  • Incorporated Altor's foam insulation material for building foundation
  • Features a 2,000-amp electrical service
No items found.

Medium length section heading

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Suspendisse varius enim in eros elementum tristique.

95

days ahead of schedule

Lorem ipsum dolor sit amet, consectetur adipiscing elit.

100k

under budget

Lorem ipsum dolor sit amet, consectetur adipiscing elit.