Laurels of Gahanna

Seeking to bring dialysis services in-house, Ciena Healthcare hired Lehman Daman to transform an existing break area into a six (6) station dialysis suite.
Laurels of Gahanna

Project Overview

The Laurels of Gahanna (owned and operated by Ciena Healthcare, formerly Laurel Healthcare) offers a full spectrum of post-hospital services, from short-term rehabilitation to long-term nursing care. Serving the Gahanna, New Albany, Westerville, and Northeast Columbus communities, Laurels of Gahanna faced a significant challenge. Their residents were being transported to and from dialysis clinics using a third-party transportation service that was not only unreliable, but costly.

Seeking to bring dialysis services in-house, Ciena Healthcare hired Lehman Daman to transform an existing break area into a six (6) station dialysis suite, complete with a biomed office and an occupational therapy training room.

Partners

Ronald J. Gajoch & Associates

Michael T. Collins Engineering

Client
Ciena Healthcare
Location
Gahanna, Ohio

General Contracting

delivery

Renovation

project type

1,500 SF

Square feet

Project Challenges

Ensuring the quality of dialysis water is of the utmost importance as even minor impurities can be harmful to patients with compromised kidney functions. Furthermore, dialysis machines require precise water pressure and flow rates to function effectively.

With these critical aspects in mind, Lehman Daman assisted by making suggestions for the plumbing design throughout the project. Lehman Daman also conducted a thorough water flow analysis to ensure that the systems installed would function seamlessly. To enhance the water supply, a booster pump was required, and Lehman Daman also implemented a cold-water bypass which provided the necessary extra pressure.

Additionally, with working in an active nursing facility, Lehman Daman needed to carefully coordinate and plan construction activities around residents. Temporary barriers were set up around the jobsite to keep the construction area separate from resident areas, preventing any wandering incidents. Lehman Daman also utilized HEPA air filters to maintain air quality throughout the project.

Project Highlights

No items found.

Medium length section heading

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Suspendisse varius enim in eros elementum tristique.

95

days ahead of schedule

Lorem ipsum dolor sit amet, consectetur adipiscing elit.

100k

under budget

Lorem ipsum dolor sit amet, consectetur adipiscing elit.

Join us. Work with us.
Build with us.

Ready to transform your vision into something remarkable? Our team is ready to bring your project to life. Let's create something special together.