Project Overview
After the successful completion of the confidential client’s first ever ground-up inspection center, the client engaged Lehman Daman to build another vehicle inspection center in Trenton, OH to help service their growing customer base. The client purchased this 117-acre site to construct their building along with 100 acres of paving to house their inventory of used vehicles.

CMaR
delivery
New Construction
project type
196,000 SF
Square feet

Project Challenges
There were three oil pipelines running the entire length of the jobsite, making the logistics for adding detention ponds complex. Lehman Daman worked closely with the architect during the design process to ensure that the pipelines were not encroached. Additionally, Lehman Daman coordinated carefully with the various pipeline companies during the excavation process. Lehman Daman delivered the project ~$546,000 under budget and one month ahead of schedule.
Project Highlights
- Varco Pruden pre-engineered metal building, divided into a central core and three wings
- 100 acres of asphalt
- Two detention ponds
- Paint booths, automatic car washes, photo domes





Medium length section heading
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Suspendisse varius enim in eros elementum tristique.
days ahead of schedule
Lorem ipsum dolor sit amet, consectetur adipiscing elit.
under budget
Lorem ipsum dolor sit amet, consectetur adipiscing elit.